PE-Services provided MEP engineering and fire protection design for the Clinton Memorial Cardiac Renovation. This project included design of a dual duct VAV system for the HVAC systems as well as specialty lighting for the cardiac exam rooms. This project also required relocating existing offices to make room for the cardiac expansion. There were two key challenges: very tight space limitation and a very tight design schedule. PE-Services designed the project in about a three-week time frame, including site verification time.
“We are working with PE-Services because
you guys always keep your word.”